1. Tuyển Mod quản lý diễn đàn. Các thành viên xem chi tiết tại đây

Cần tìm người dịch tài liệu TIÊU CHUẨN KĨ THUẬT THI CÔNG ĐƯỜNG (Nhờ mod 1 ngày)

Chủ đề trong 'Anh (English Club)' bởi lazy_pinky, 19/03/2007.

Trạng thái chủ đề:
Đã khóa
  1. 0 người đang xem box này (Thành viên: 0, Khách: 0)
  1. lazy_pinky

    lazy_pinky Thành viên mới

    Tham gia ngày:
    04/08/2006
    Bài viết:
    245
    Đã được thích:
    0
    Cần tìm người dịch tài liệu TIÊU CHUẨN KĨ THUẬT THI CÔNG ĐƯỜNG (Nhờ mod 1 ngày)

    cần tìm người hoặc ĐỊA CHỈ TIN CẬY ĐỂ dịch TIÊU CHUẨN KĨ THUẬT CHO THI CÔNG ĐƯỜNG

    YÊU CẦU: DỊCH 100 TRANG TRONG 2 NGÀY (tHU3+tHU4)

    TECHNICAL SPECIFICATION

    TABLE OF CONTENTS

    CLAUSE NO CLAUSE HEADING PAGE NO.

    C1 BULK EARTHWORKS C1.1

    C2 ROAD PAVEMENT FORMATION C2.1

    C3 STORMWATER DRAINAGE & ASSOCIATED STRUCTURES C3.1

    C4 EXCAVATION & BACKFILL FOR SERVICES & TRENCHES C4.1

    C5 BITUMINOUS PAVING, SEALING & KERBING C5.1

    C6 RETAINING WALLS & MISCELLANEOUS WORKS C6.1

    C7 CONCRETE WORKS C7.1



    Được lazy_pinky sửa chữa / chuyển vào 22:07 ngày 19/03/2007
  2. lazy_pinky

    lazy_pinky Thành viên mới

    Tham gia ngày:
    04/08/2006
    Bài viết:
    245
    Đã được thích:
    0
    VOLUME 2
    PART C1 - BULK EARTHWORKS
    C1.2 SCOPE OF WORK
    C1.2.1 Specified in this Section

    The work specified in this section includes but is not
    necessarily limited to the following:-
    (a) Clearing & Demolition Work
    (b) General Excavation
    (c) Area Filling and Compaction
    (d) Testing of Compaction
    (e) Reinstatement Work
    all complete as shown on the drawings and specified.
    C1.2.2 General
    (i) The Contractor shall visit and examine the site and ascertain the nature, amount, and con***ion of the materials to be removed. He shall consider the amount of working space available on the site, types of equipment suitable for the work, and the availability of off site dumps or storage space.
    (ii) The Contractor shall obtain and pay for all required permits, fees, bonds and/or escrows before starting the work, and shall present evidence of having done so if required by the Engineer.
    (iii) The Contractor is to ensure that his work will not interfere with the flow of street traffic and, if necessary, obtain the assistance of traffic police to control the flow of traffic.
    C1.3 APPLICABLE DOCUMENTS
    CODES & STANDARDS
    Except where otherwise specified, all materials and workmanship shall conform to the requirements of the latest e***ions of applicable standards of among others the Vietnam Technical Standards (TCVN series), the American Society for testing and Materials (ASTM) and the American Concrete Institution.
    GIÁ CẢ: 50K/TRANG
    Được lazy_pinky sửa chữa / chuyển vào 22:12 ngày 19/03/2007
Trạng thái chủ đề:
Đã khóa

Chia sẻ trang này